Connected Infrastructure Capital and AXPO signed a 10-year PPA for Norra Hunna wind farm in Sweden.
The Norra Hunna wind farm near Askersund in the Swedish province of Örebro has a total rated power of 16.4 MW. The wind farm is going into operation in May 2021.